Through comparison with the actual measurement result, it is approved that this calculation system meet the calculation precision requirements of the project.
经与矫直力实测结果比较, 证明该计算体系的计算精度满足工程的要求。
Place calculative is dynamic the result be identical of recrystallization rate and peak value stress and actual measurement is good.
所计算的动态再结晶率以及峰值应力和实测的结果吻合良好。
It is the first actual test result of the optical systems PST measurement in China.
在国内第一次成功获得光学系统PST的可靠测试结果。
应用推荐